Risk Analysis Run View
Risk analysis runs can only be carried out if the Risk option is enabled on your licence.
The Risk Analysis Run View schedules a risk analysis simulation. The view is displayed when a new risk analysis run is created (by right-clicking on a model group and selecting New InfoWorks | Risk analysis run) or when an existing run is opened (by right-clicking on a risk analysis run and selecting Open).
Run parameter | Description |
---|---|
Title |
Enter a run title. If the entered title already exists, exclamation marks (!) will be appended to the run name until a unique name is created. |
Run button |
Click the Run button to carry out the risk analysis simulation. The Run button will be disabled if there is missing information in the view. |
Damage Function |
Select a Damage Function by using one of the following methods:
|
Run |
Select an hydraulic Run by using one of the following methods:
Multiple runs may be selected. To be used in a risk analysis run, all selected runs must use the same set of scenarios in the same version of the same network. The network must have at least one Damage Receptor in at least one of the scenarios. All simulations must be complete. |
Largest zero-damage event return period (years) |
Largest return period event for which no damage will occur. May be any non-negative value, including zero. |