Closing control data
You cannot close control data separately while leaving the network open. The network and control data are both closed when the GeoPlan Window for the network is closed.
If you associate a new control data set with a network which already has associated control data, the new control data becomes associated with the network, and the existing control data is closed. See Associating Control Data with a Network.