Network menu

Menu item Description
Version control Options for the version control functionality.

Validate network

Allows checking of the network for missing values, errors and inconsistencies. See Validating Networks Validation for details. More

Availability: Whenever there is a currently active network.

Toolbar: Operations

Keyboard Shortcut: Alt+N, A

Next error

Used to move to the next error / warning message in the list in the Output Window and select the object to which the message refers. The object and the field to which the message refers will be selected in the grid view. More

Availability:Whenever there are messages in the output window (after the network has been validated) and a grid view is the currently active window.

Toolbar: None

Keyboard Shortcut: Alt+N, N or F4

Previous error

Used to move to the previous error / warning message in the list in the Output Window and select the object to which the message refers. The object and the field to which the message refers will be selected in the grid view. More

Availability: Whenever there are messages in the output window (after the network has been validated) and a grid view is the currently active window.

Toolbar: None

Keyboard Shortcut: Alt+N, P or Shift+F4

Update from calibration

Enables update of link Roughness values from a Calibration run or from a CSV file. See Updating the Network from Calibration Results for details. More

Availability: Whenever a GeoPlan or network Grid View of a checked out network is the currently active window.

Toolbar: None

Keyboard Shortcut: None

Update nominal pressures

Enables update of node Nominal Pressure values from simulation results. See Updating Nominal Pressures for details. More

Availability: Whenever a GeoPlan or network Grid View of a checked out network is the currently active window.

Toolbar: None

Keyboard Shortcut: Alt+N, N

Update initial concentrations

Enables update of node Initial Concentration values from simulation results. See Updating Initial Concentrations/Turbidities from Results for more information. More

Availability: Whenever a checked out Control is associated with the currently active network.

Toolbar: None

Keyboard Shortcut: Alt+N, I

Update initial turbidities Enables update of node Initial Turbidity values from simulation results. See Updating Initial Concentrations/Turbidities from Results for more information. More

Availability: Whenever a checked out Control is associated with the currently active network.

Toolbar: None

Keyboard Shortcut: Alt+N, N

Update initial shear strengths from maximum shear ~

Update criticality

Enables update of link Criticality values from a set of Critical Link Analysis simulation results. See Updating Link Criticality from CLA Results for details. More

Availability: Whenever a checked out network view is the currently active window.

Toolbar: None

Keyboard Shortcut: Alt+N, C

Update from CSV files

Enables import and update of network data from CSV files. See Updating from CSV Data for more details. More

Availability: Whenever a GeoPlan or Grid view of a checked out network is the currently active window.

Toolbar: None

Keyboard Shortcut: Alt+N, S

Update from InfoAsset snapshot

Enables update of network data from an InfoAsset snapshot file. SeeUpdating from InfoAsset data for more information. More

Availability: Whenever a GeoPlan or Grid view of a checked out network is the currently active window.

Toolbar: None

Keyboard Shortcut: Alt+N, F

Compare

Enables comparison of a network with a number of other networks. See Comparing Networks for more details. More

Availability: Whenever a GeoPlan or network Grid View is the currently active window.

Toolbar: None

Keyboard Shortcut: Alt+N, C

Results

Contains submenu items allowing control of simulation replay. More

Rewind

Jump to the start of the simulation. If a replay is running it will continue from the start of the simulation

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, R

Backstep

Step back in time through the simulation

Toolbar: Replay

Keyboard Shortcut: Alt+F5

Pause

Pause the replay.

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, A or Alt+F6

Single step

Step forward in time through the simulation

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, S or Alt+F7

Play

Play a replay of the results of the simulation.

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, P or Alt+F8

Record

Start the process of recording a simulation replay as an AVI video file.

See Recording a Replay as an AVI File for more information.

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, E or Alt+F9

Loop

Play a replay of the simulation results in continuous repeat mode.

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, L

Fast forward

Jump to the end of the simulation

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, F

Replay options

Used to set replay options for simulation results.

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, O

Clear results

Clear the results currently displayed

Toolbar: Replay

Keyboard Shortcut: Alt+N, R, C

Availability: Whenever a simulation or simulation grid view is the currently active window.

Open Data Import Centre

Enables import of network data from external data sources. See Open Data Import Centre for more details. More

Availability: Whenever a GeoPlan Window of a checked out network is the currently active window.

Toolbar: None

Keyboard Shortcut: None

Import data from Autocad DWG

Enables import of network objects from AutoCAD DWG files. See Importing from AutoCAD DWG for more details. More

Availability: Whenever a GeoPlan or Grid View of a checked out network is the currently active window.

Toolbar: None

Keyboard Shortcut: None

Open Data Export Centre

Enables export of network data to external data sources. See Open Data Export Centre for more details. More

Availability: Whenever a network is the currently active window.

Toolbar: None

Keyboard Shortcut: None

Control time interval

Allows viewing and editing of Simulation Start and End Times and the Timestep of a Control Data Set. More

Availability: When there is a Control associated with the currently active network.

Toolbar: None

Keyboard Shortcut: Alt+N, T

Update controls from live data

Allows the update of time varying control data automatically from Live Data linked to the model. See Updating Control Data from Live Data Links for details. More

Availability: When there is a Control associated with the currently active network.

Toolbar: None

Keyboard Shortcut: Alt+N, U

Link live data points

Allows automatic linking of Live Data to the model by matching Live Data Point ID to network object Asset ID or Object ID. See Linking Live Data to the Model for details. More

Availability: When a checked out network is associated with the currently active network, and a Live Data Configuration is open.

Toolbar: None

Keyboard Shortcut: None

Global UPC script

Allows viewing and editing of the Global UPC Script in a Control Data set. See UPC Scripts for more information. More

Availability: Whenever the current window is a GeoPlan Window with an associated Control.

Toolbar: None

Keyboard Shortcut: Alt+N, U

Control data overview

Displays a summary of all of the control objects in the network. See Displaying a Control Data Summary for more details. More

Availability: Whenever the current window is a GeoPlan Window with an associated Control.

Toolbar: None

Keyboard Shortcut: Alt+N, O

Control data exceptions

Displays a list of control data that is not associated with any of the objects in the current network. See Dealing with Orphan Control Data for more details. More

Availability: Whenever the current window is a GeoPlan Window with an associated Control.

Toolbar: None

Keyboard Shortcut: Alt+N, E

Clear control

Clear the Control Data associated with the current Network from the GeoPlan Window. No changes will be made to the Control Data itself. See Associating Control Data with a Network for more details. More

Availability: Whenever the current window is a GeoPlan Window with an associated Control.

Toolbar: None

Keyboard Shortcut: None

Clear ground model

Clear the Ground Model loaded onto the current GeoPlan Window. No changes will be made to the Ground Model itself. See Loading a Ground Model on the GeoPlan for more details. More

Availability: Whenever a Ground Model is loaded onto the current GeoPlan Window.

Toolbar: None

Keyboard Shortcut: None

Initialise alternative demand

Copies Node and Customer Point demand data from the current network to an associated Alternative Demand. See Initialising Alternative Demand for more information. More

Availability: Whenever a checked out Alternative Demand is associated with the current network in the GeoPlan Window.

Toolbar: None

Keyboard Shortcut: None

Update alternative demand TBC

Copy alternative demand to network

Copies Node and Customer Point demand data from an associated Alternative Demand to the current network. See Copying Alternative Demands to the Network for more information. More

Availability: Whenever an Alternative Demand is associated with a current checked out network in the GeoPlan Window.

Toolbar: None

Keyboard Shortcut: None

List all hyperlinks

Displays a list of all hyperlinks attached to objects in the currently active network. The list can be used to access the hyperlinked information. More

Availability: Whenever a network view is the currently active window.

Toolbar: None

Keyboard Shortcut: None

Run add-on Lists add-ons that can be run (if any).
Run Ruby script Opens a window for selecting a Ruby script to run.
Recent scripts Lists recently accessed scripts (if any).

Network options

Used to set options for automatic generation of Node IDs based on coordinates or on a user defined pattern.

More

Availability: Whenever a GeoPlan Window is the currently active window.

Toolbar: None

Keyboard Shortcut: None

Network overview

Displays a summary of the objects in the network and some additional information about selected parameters. See Network Summary for more details. More

Availability: Whenever a network view is the currently active window.

Toolbar: None

Keyboard Shortcut: None


About the menus